Frequently Asked Questions
Optical Transceiver Parts
-
How long can we receive a reply when we provide the design drawings?DFM and the quotation of the product usually will be provided within one working day.
-
When we place a tooling order, what verification will you do?We will provide engineering samples to you to do FFF test verification. Synchronously full-scale measurement, FAI report, 85/85 temperature, humidity testing, and Pull force test will be processed and provided.
-
How long does it take to making new tooling?Usually, it takes 4 to 6 weeks.
Connectors
-
Product L/TStandard 4 weeks; Urgent within 2 weeks.
-
Can we have customized product?COMOSS has its own R&D engineer team for product and relatives tool design, so we can make mold design, all customized services can be provided.
-
Are the products quality stable?All products are 100% tested to ensure the stable quality of shipments.
-
How to carry out a quality inspection for mass production orders?All RJ connectors will be 100% tested during the production of the automatic machine and automatically detected by the automatic equipment.